Starter Vape Kit mould: first-time order
This page is for brand owners who want a working answer on specification, price and lead time before they commit a purchase order. We have written the detail down so nobody has to sit through a sales call to extract it.
Published 02 September 2025 · VapeWholesaleHub · Reading time 8 min
Keeping the second shipment identical
If you are comparing three quotes for starter vape kit, compare the paperwork first. Test reports, artwork files, batch coding and the replacement clause tell you more about a supplier than the unit price on page one.
Returns are handled as data, not as complaints. Every reported failure is logged by mode and by batch, and the pattern is reviewed monthly with the factory.
Reorders are the real test of a supplier. If the second shipment does not match the first, the relationship is over regardless of price, so we treat the reorder as the actual deliverable.
Getting the documents right
Advertising rules are stricter than product rules in most markets. Claims about cessation, health or comparative performance should stay off packaging and off your product pages unless your legal team has signed them off.
Artwork approval is a two stage process: a digital proof for text and layout, then a physical dummy for colour and finish. Skipping the dummy is the single most common cause of a reprint.
What we test before a carton is sealed
Leak complaints almost always trace back to one of three things: an over-torqued centre post, a seal that sat in a hot container, or a fill volume pushed past the design limit. We cap fill volume slightly below maximum for exactly that reason.
We photograph the packing station during production for volume orders. It is a small thing, but it settles most arguments about what was actually in the carton before it was sealed.
- Document pack prepared per destination market
- Artwork proof plus physical dummy for custom packaging
- Named account contact who has handled the product
- Seven-day defect reporting with replace-or-credit
- Standing reorder schedule with a fixed cut-off
- Cartons drop-tested and pallet-counted for clean freight
Unit price versus landed cost
Currency moves more than most buyers expect over a twelve month supply plan. We quote in USD and hold the price for 30 days from confirmation so your margin calculation is not guesswork.
Unit price breaks usually land at 300, 800 and 1600 pieces. Between those steps the cost curve flattens, which is why pushing a 200 unit order to 500 often costs less per unit than buyers expect.
Specification summary
| Battery | 350 mAh |
| Pod capacity | 3.0 ml |
| Coil resistance | 0.8 ohm |
| Included | Device, pod, cable |
| Charging | USB-C 5V/1A |
| Packaging | Retail box |
| Minimum order | 100 units per SKU, mixed cartons allowed |
| Lead time | 18 working days after artwork approval |
We would rather lose an order at quotation stage than explain a mismatch after delivery, which is why the specification conversation comes before the price conversation.
Frequently asked
How long does production take?
Around 12 working days after artwork approval for stock configurations, plus transit. Custom runs add roughly a week for tooling and a physical dummy. We confirm the date in writing on the order acknowledgement.
How do you handle repeat orders?
The specification is held on file against your account, so a reorder is a reference rather than a new brief. We recommend a standing schedule with a fixed weekly cut-off so stock lands before the shelf empties.
What is the minimum order for starter vape kit?
Standard configurations start at 300 units per SKU, with mixed SKUs allowed inside the same carton. Custom colours, custom packaging or a private label run usually start at 800 units because of setup time on the line.
Related reading
Need a quotation on starter vape kits?
Send destination market, target price and quantity. Same-day reply on working days.
Tel / WeChat / WhatsApp +86 13711127975 · vape@0099933.xyz